Two Clocks: Why Larger Rollout Batches Learn Slower but Fail on Schedule in Reinforcement Learning with Verifiable Rewards
Ranking
Overall
81
Content
100
Popularity
37
Observed public metrics from 1 member.
Merged summary
TL;DR - This paper explains why scaling RLVR rollout batches with a square-root learning-rate rule can reduce sample efficiency even while preserving a roughly fixed time-to-failure in samples. It proposes a two-stage batch schedule that improves progress before training collapse.
- A “two-clock” framework separates samples required for learning progress from samples consumed before collapse.
- Larger batches mean fewer, longer optimizer updates, increasing curvature losses beyond a learning-rate-dependent critical batch.
- GRPO experiments on Qwen2.5 models across a 16× batch range support both the progress slowdown and approximately batch-invariant failure clock.
- Ratio clipping delays failure but does not eliminate the progress gap; the derived schedule starts below the critical batch and switches to a larger batch before failure.
Sources (1)
Two Clocks: Why Larger Rollout Batches Learn Slower but Fail on Schedule in Reinforcement Learning with Verifiable Rewards
Public signals
Semantic Scholar citations 0 · Semantic Scholar influential citations 0
TL;DR - This paper explains why scaling RLVR rollout batches with a square-root learning-rate rule can reduce sample efficiency even while preserving a roughly fixed time-to-failure in samples. It proposes a two-stage batch schedule that improves progress before training collapse.
- A “two-clock” framework separates samples required for learning progress from samples consumed before collapse.
- Larger batches mean fewer, longer optimizer updates, increasing curvature losses beyond a learning-rate-dependent critical batch.
- GRPO experiments on Qwen2.5 models across a 16× batch range support both the progress slowdown and approximately batch-invariant failure clock.
- Ratio clipping delays failure but does not eliminate the progress gap; the derived schedule starts below the critical batch and switches to a larger batch before failure.