91% ≈ 0%?谷歌最新研究,戳破工程 Agent 的高正确率泡沫
Ranking
Overall
82
Content
95
Popularity
N/A
No observed public metrics; popularity remains neutral/archived.
Merged summary
TL;DR - Google and Mercor’s Physical-Engineering’s Last Exam (PLE) shows that high per-constraint accuracy does not translate into deployable engineering designs. Engineering agents need constraint-aware search, consistent state management, and executable verification loops.
- Claude Opus 5.5 with Claude Code scored 48.3% on 56 hidden tests; despite satisfying 91% of individual constraints in co-created tasks, only 41.3% of designs passed every hard safety and feasibility constraint.
- PLE uses hard-constraint gating: cost or performance improvements earn no optimization credit unless all mandatory constraints pass.
- Its 85 tasks span 5,170 mixed engineering files, testing whether agents can reconcile revisions, dependencies, calculations, and CAD/BIM geometry.
- Production-grade engineering agents will need versioned design state, dependency-based invalidation, incremental recomputation, and deterministic validators integrated into the design loop.
Sources (1)
91% ≈ 0%?谷歌最新研究,戳破工程 Agent 的高正确率泡沫
Public signals
N/A
TL;DR - Google and Mercor’s Physical-Engineering’s Last Exam (PLE) shows that high per-constraint accuracy does not translate into deployable engineering designs. Engineering agents need constraint-aware search, consistent state management, and executable verification loops.
- Claude Opus 5.5 with Claude Code scored 48.3% on 56 hidden tests; despite satisfying 91% of individual constraints in co-created tasks, only 41.3% of designs passed every hard safety and feasibility constraint.
- PLE uses hard-constraint gating: cost or performance improvements earn no optimization credit unless all mandatory constraints pass.
- Its 85 tasks span 5,170 mixed engineering files, testing whether agents can reconcile revisions, dependencies, calculations, and CAD/BIM geometry.
- Production-grade engineering agents will need versioned design state, dependency-based invalidation, incremental recomputation, and deterministic validators integrated into the design loop.